POWERGRID Khetri Transmission System Limited

Acq Date :  
Date of Incorporation :  
Commissioned
TBCB Subsidiaries
Annual Report -
 PKTSL_AR.pdf (3.54 MB)
Financial Statements -
 PKTSL.pdf (2.39 MB)
Director List

1) Establishment of 765/400kV, 2x1500 MVA S/s at suitable location near Khetri with 765kV (2x240MVAR) and 400kV (1x125 MVAR) bus reactor

  • 765/400kV- 2x1500MVA
  • 765kV ICT bay-2
  • 400kV ICT bay-2
  • 400kV line bay-2
  • 765kV line bay-2
  • 240 MVAr (765kV) Bus Reactor -2
  • 125MVAr (400 kV) Bus Reactor -1
  • 765 kV Reactor bay – 2
  • 400 kV Reactor bay -1
  • 1X500 MVA, 765/ 400 kV, 1-ph ICT (spare unit)
  • 1X80 MVAR, 765 kV, 1-ph Reactor (spare unit)
    (for both 1X240 MVAR bus reactor and 2X240 MVAR line reactor on Bikaner – Khetri 765kV D/c line at Khetri end)
Future provisions:
Space for:
  • 765/ 400 kV ICTs along with bays: 2 nos.
  • 400/220 kV ICTs along with bays: 4 nos.
  • 765kV line bays: 4nos
  • 400kV line bays: 4nos.
  • 220kV line bays: 7nos

2) Khetri – Sikar (PG) 400kV D/c line (AL59)

3) 400kV line bays at Sikar (PG) for Khetri – Sikar (PG) 400kV D/c line (Twin AL59)

4) Khetri– Jhatikara 765kV D/c line

5) 765kV bays at Jhatikara for Khetri– Jhatikara 765kV D/c line

6) 1x240 MVAR Switchable Line reactors for each circuit at Jhatikara end of Khetri – Jhatikara 765kV D/c line along with reactor bays

  • 1X80 MVAR, 765 kV, 1-ph Reactor (spare unit)
    (for 240 MVAR line reactor on each ckt of Khetri – Jhatikara 765 kV D/c line at Jhatikara end)