Skip to main content
Loading

Milestones

Whistle Blower and Fraud Preventation Policy

  • Long cherished dream of One Nation-One Grid-One Frequency accomplished with the commissioning of 765 kV single circuit line Raichur-Solapur(South-West)
  • Dedicated 765 kV single circuit Agra-Meerut Transmission Line to the Nation.
  • Foundation stone laid for ±800 kV, 6000 MW multi-terminal HVDC system of about 2,000 km from Biswanath Chariali in Assam and Alipurduar of West Bengal to Agra in Uttar Pradesh.
  • Bheramara (Bangladesh)-Baharampur (India) 400 kV double circuit line along with HVDC back to back terminal at Bangladesh commissioned to strengthen SAARC grid.
  • Second Follow-on Public Offer (FPO) of equity shares launched.
  • International Credit Rating taken up for first time-S&P and Fitch Rating Rate POWERGRID BBB-(Outlook-Stable).
  • First Foreign Currency Bond taken.
  • Listed in Singapore Stock Exchange.
Milestones Year