POWERGRID Neemuch Transmission System Limited

Acq Date :  
Date of Incorporation :  
Under Implementation
TBCB Subsidiaries
Annual Report -
 Neemuch_AR.pdf (7.92 MB)
Financial Statements -
 PNTSL.pdf (7.29 MB)
Director List

Scope

1) Establishment of 2x500 MVA, 400/220 kV Pooling Station (AIS) at Neemuch with 1x125 MVAr Bus Reactor

  • 400/220 kV, 500 MVA ICT –2 nos.
  • 400 kV ICT bays – 2 nos.
  • 220 kV ICT bays – 2 nos.
  • 400 kV line bays –4 nos. (2 each for Chittorgarh & Mandsaur lines)
  • 220 kV line bays – (2 nos. of bays corresponding to 500 MW Connectivity / LTA granted to M/s RUMSL)
  • 220kV Bus coupler bay- 1 no.
  • 220kV Transfer Bus Coupler (TBC) bay - 1 no.
  • 125 MVAR, 420 kV reactor-1 no.
  • 420 kV reactor bay – 1 no.

Future provisions:
Space for

  • 400/220 kV ICTs along with bays: 2 nos.
  • 400 kV line bays: 6 nos.
  • 220 kV line bays: 5 nos.
  • 420kV bus reactor along with bays:1

2) Neemuch PS – Chhittorgarh (PG) s/s 400 kV D/C line (conductor with minimum capacity of 2100 MVA/Ckt at nominal voltage)

3) 2 nos. of 400 kV line bays at Chhittorgarh (PG) 400 kV s/s for Neemuch PS – Chhittorgarh (PG) s/s 400 kV D/C line (conductor with minimum capacity of 2100 MVA/Ckt at nominal voltage)

4) Neemuch PS- Mandsaur s/s 400 kV D/C line (conductor with minimum capacity of 2100 MVA/Ckt at nominal voltage)

5) 2 no. of 400 kV line bays at Mandsaur 400 kV s/s for Neemuch PS- Mandsaur s/s 400 kV D/c line (conductor with minimum capacity of 2100 MVA/Ckt at nominal voltage)